LARGE DOOR REPLACEMENT & RETROFIT.

When your existing door is becoming a problem, we’ll help you work out what to do next.

When an existing large door is no longer performing as it should, the first step is understanding why.

The issue may sit with individual components, the operating system, the door itself or the way the opening is now being used. In some cases, repair or refurbishment is the practical option. In others, replacing the system provides a better way forward.

OpenX assesses existing large door systems and develops replacement and retrofit solutions for aviation, industrial, mining and specialised facilities.

The process starts with the existing conditions: the door, the opening, the structure and the operational requirements around it.

START WITH THE EXISTING SYSTEM

Replacing a large door in an existing building is different to designing one as part of a new build.

The opening is already established. The structure is already carrying loads. Services, access and equipment may surround the door. The facility may also need to remain operational while the work takes place.

Before considering a replacement system, we look at what is already there.

This includes the condition and configuration of the existing door, how it operates, the available opening, the supporting structure and any limitations that may affect a retrofit.

Just as importantly, we look at what the opening needs to do now.

A building that has been operating for 10, 20 or 30 years may have very different requirements from when the original door was installed.

REPAIR, RETROFIT OR REPLACE?

Not every ageing door needs to be replaced.

The condition of the existing system, availability of components, maintenance history and current operational requirements all influence the most practical approach.

REPAIR

Where the existing system remains suitable and the issue can be addressed through maintenance or component replacement, repair may be the appropriate option.

RETROFIT OR UPGRADE

Where the core system remains serviceable, there may be opportunities to upgrade selected components, controls, automation or other elements without replacing the complete door.

REPLACE

Replacement may be considered where the existing system has become unreliable, difficult to maintain, obsolete or no longer suited to the opening and operation.

An assessment provides the information needed to understand which approach is appropriate before a larger scope of work is developed.

RETROFITTING A LARGE DOOR INTO AN EXISTING BUILDING

A replacement door doesn’t exist independently of the building around it.

The existing structure needs to be considered alongside the loads, movement and support requirements of the proposed system.

A retrofit assessment may consider:

THE OPENING

Clear width and height, headroom, side room and the physical condition of the existing opening.

THE STRUCTURE

Existing framing, available support, structural capacity and any modifications that may be required to accommodate the new system.

THE OPERATION

What moves through the opening, how frequently the door operates and any access or workflow requirements that influence its use.

THE ENVIRONMENT

Wind conditions, exposure, dust, corrosion and other site conditions that may affect the design and specification.

THE EXISTING SYSTEM

The door configuration, operating mechanisms, controls, condition and the issues prompting the assessment.

FUTURE REQUIREMENTS

Changes to aircraft, equipment, vehicle movements, automation or the way the facility may be used over time.

These conditions establish the parameters for the replacement or retrofit design.

REPLACEMENT DOESN’T ALWAYS MEAN LIKE FOR LIKE

An existing sliding door doesn’t necessarily need to be replaced with another sliding door.

The same applies to folding, tilting and other large door systems.

A replacement project creates an opportunity to reassess the opening based on its current requirements rather than simply replicating the original system.

Changes in aircraft size, equipment, traffic movements, frequency of use or operating requirements may influence which door configuration is now most suitable.

The existing structure will also play a role in determining what is practical.

OpenX considers both sides of that equation: what the operation requires and what the building can accommodate.

WHAT WE CONSIDER

THE OPENING

The clear opening required and the physical space available for the door system.

THE BUILDING

How the proposed door interacts with the existing structure and whether modifications are required.

THE OPERATION

How the opening is used, what moves through it and how frequently the door needs to operate.

THE ENVIRONMENT

The conditions the system will be exposed to throughout its working life.

THE WAY IT MOVES

The door configuration, operating method, controls and automation requirements.

THE LONG TERM

Inspection, maintenance, access, component availability and future operational requirements.

FROM EXISTING CONDITIONS TO A NEW DOOR SYSTEM

SITE ASSESSMENT

The existing door, opening and surrounding structure are reviewed to establish the current conditions and project requirements.

OPTIONS & SCOPE

Repair, retrofit and replacement options can then be considered, along with any structural or operational constraints that may influence the scope.

ENGINEERING

Where a new door system is required, it is engineered around the existing opening, structure, site conditions and operating requirements.

STRUCTURAL COORDINATION

Any interfaces between the new door and existing building are identified so required modifications or additional support can be resolved before installation.

MANUFACTURING

Once the design is resolved, the door system is manufactured to the project requirements.

INSTALLATION & COMMISSIONING

Removal, installation and commissioning are coordinated with consideration for site access, safety and the operation of the facility.

LIFECYCLE SUPPORT

Inspection, servicing, maintenance and repair can continue throughout the working life of the new system.

PLANNING FOR AN OPERATIONAL SITE

For many replacement projects, the door is part of an active facility.

Aircraft may still need access to a hangar. Vehicles and equipment may need to move through an industrial building. Production or maintenance activities may be taking place around the opening.

Installation access and sequencing therefore form part of the planning process.

Understanding these constraints early helps identify what can be completed while the facility remains operational, where access may need to be restricted and how the removal and installation sequence should be approached.

REPLACEMENT & RETROFIT APPLICATIONS

OpenX replacement and retrofit projects can be developed for large openings across:

Navy and amber duotone graphic of a turboprop aircraft nose-on inside a hangar, representing the aviation sector

AVIATION

Aircraft hangars where an existing door has reached the end of its serviceable life, requires significant maintenance or no longer provides the required clear opening.

Navy and amber duotone graphic of a warehouse filled with racking and stock, representing the industrial sector

INDUSTRIAL & LOGISTICS

Workshops, warehouses, manufacturing and logistics facilities where door performance directly affects vehicle, equipment or material movement.

Navy and amber duotone graphic of a worker beside a giant mining haul truck, representing the mining sector

MINING

Large openings operating in demanding environments, including facilities accommodating heavy vehicles and equipment.

Navy and amber duotone graphic of a military drone parked in a hangar, representing the defence sector

DEFENCE & SPECIALISED FACILITIES

Projects where the existing building, operation and project requirements require a more considered engineered solution.

ENGINEERED AROUND THE EXISTING CONDITIONS

Retrofit projects often uncover conditions that aren’t obvious from the original drawings.

Buildings move and change over time. Openings may have been modified. Previous repairs may have altered the original system. Structural information may be incomplete.

These conditions need to be understood before the replacement door is finalised.

OpenX brings the assessment, engineering, manufacturing and installation requirements together so the new system is developed around the building that exists, not simply the building shown on a drawing.

FREQUENTLY ASKED QUESTIONS

Can a large door be retrofitted into an existing building?

D

Yes, in many cases. The existing opening and structure need to be assessed to determine which door systems can be accommodated and whether structural modifications or additional support are required.

Does an existing door need to be replaced with the same type?

Not necessarily. The replacement system can be considered against the current requirements of the opening, operation and building rather than simply replicating the existing door configuration.

How do you determine whether a large door should be repaired or replaced?

The assessment considers the condition of the existing system, maintenance history, availability of components, reliability and whether the door continues to meet the operational requirements of the facility.

Can an existing door opening be made wider or taller?

Potentially. Any change to the opening needs to be considered in relation to the existing building structure. Structural assessment may be required before the feasibility of a larger opening can be determined.

Will structural modifications be required for a replacement door?

Not always. This depends on the existing structure and the loads and support requirements of the proposed door system. Where modifications are required, they should be identified as part of the engineering and coordination process.

Can an existing large door be upgraded with automation?

Depending on the existing system and its condition, controls or automation may be able to be upgraded without replacing the complete door. This needs to be assessed against the existing door and operating system.

Can aircraft hangar doors be replaced or retrofitted?

Yes. Existing hangar doors and openings can be assessed to determine replacement options based on the structure, clear opening, aircraft requirements and operation of the facility.

How is downtime managed during a door replacement?

Installation sequencing depends on the existing door, site access, replacement system and operation of the facility. These requirements are considered during planning so access restrictions and installation requirements can be understood before work begins.

ASSESSING AN EXISTING LARGE DOOR?

If an existing door is becoming unreliable, requires significant maintenance or no longer suits the way the opening is used, an assessment can establish what options are available.

OpenX can review the existing system, opening and building requirements before developing a repair, retrofit or replacement scope.